9.4
Total charging weight of the
refrigerant (after a leak, etc.)
The total charging amounts relate to the refrigerant
piping length.
Refrigerant piping length (liquid side)
Model
1U105S2SS1FA/B
1.7 1.7 1.7 2.15 2.6
1U105S2SS2FA
2.0 2.0 2.0 2.45 2.9
1U125S2SN1FA/B
1U125S2SN2FA/B
2.3 2.3 2.3 2.75 3.2 3.65 4.1 4.55
1U140S2SN1FA/B
1U140S2SP1FA/B
2.9 2.9 2.9 3.35 3.8 4.25 4.7 5.15
1U140S2SP2FA
1U140S2SP2FB
3.5 3.5 3.5 3.95 4.4 4.85 5.3 5.75
1U160S2SP1FB
9.5 Add oil instruction
The cumout of oil added can be calculated by the
following formula :Q=(A+(L-30)*B)/4-C
factory refrigerant
mode
charge
A(g)
1U105S2SS1FA/B
1700
1U105S2SS2FA
2000
1U125S2SN1FA/B
1U125S2SN2FA/B
2300
1U140S2SN1FA/B
1U140S2SP1FA/B
2900
1U140S2SP2FA
1U140S2SP2FB
3500
1U160S2SP1FB
Note:
a. when Q£...0,oil added=0;
b. when Q£ 0,oil added=Q(cc);
c. L is the liquid pipe length, unit(m)
10. Electrical wiring work
„ All wiring must be performed by an authorized
10.1. Precautions on electrical wiring work
-
-
-
„ When servicing the unit requires the refrigerant
-
-
-
„ Before obtaining access to terminal devices, all
recharge
factory oil
quantity
charging
„ Be sure to install an earth leakage circuit breaker in
B(g/m)
C(cc)
45
800
45
870
„ Use only copperwires.
45
870
„ A main switch or other means for disconnection,
45
1250
45
150
„ Make sure to connect power supply cables in normal
„ Never squeeze bundled cables into a unit.
„ Fix cables so that cables do not make contact with
19
WARNING
electrician.
All components procured on the side and all elecrtic
construction shall comply with the applicable
legislation.
DANGER: HIGH VOLTAGE.
To avoid electrical shock, make sure to
disconnect the power supply 1 minute or more
before servicing the electrical parts. Even after
1 minute, always measure the voltage at the
terminals of main circuit capacitors or electrical
parts and, before touching , make sure that
those voltages are 50VDC or less.
NOTICE
To persons in charge of electrical wiring work:
Do not oerate the unit until the refrigerant piping
is complete. (Running it before the piping is
ready will break the compressor.)
system to be opened, treatment and evacuation
of refrigerant must be done in accordance with
applicable legislation. Refrigerant can not be charged
until field wiring has been completed.
Refrigerant may only be charged after performing the
leak test and vacuum drying.
DANGER
supply circuits must be interrupted.
accordance with aplicable legislation. Failure to do
so may cause electrical shock.
having a contact separation in all poles, must be
incorporated in the fixed wiring in accordance with
applicable legislation. Do not turn on the main switch
until all the wiring is completed.
phase.
the pipes (especially on high pressure side).