Completed Step. 14b View
Horizontal Left Coil Assembly
F
RUBBER
PLUGS
G
H
10
11
I
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
Step.14c Remove the rubber plugs indicated in the image above.
J
1
2
DETAIL A
2 PLASTIC TIES
PER SIDE
Step.14d Next, install the clear plastic tubes which are included
in the accessory bag. Ensure the plastic tubes drain into the pan.
Also, be sure the clear plastic tubes do not have any restriction.
Cutting of the plastic tube is required, please refer to the table for
length. Finally, secure the clear plastic tubes to the top drain pan
per Detail A. Then to the metal brackets supporting the coil to the
top drain pan with the provided plastic ties as shown.
F
G
H
I
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
J
8
9
1
2
3
12
13
14
3
4
5
2 PLASTIC TUBES
ENSURE TUBES
DRAIN INTO
DRAIN PAN
RUBBER PLUGS
CORRECT
PLASTIC TIE
PLASTIC TUBE
Model
10
11
12
MVZ-A12, 18, 24
4
5
6
7
MVZ-A30, 36
SIDE DRAIN PAN
ON BOTTOM
15
16
A
Step.15 Reinstall the coil assembly along with bracket(s) that
secure(s) it. Failure to reinstall the brackets will result in capacity
loss and condensation formation inside the cabinet. The wiring
harness for the thermistor connector will also reroute into the
electrical section and plug into CN44. Refer to 9.3. Step 1 to 4
B
in reverse order to reassemble the panels. Ensure the proper
6
7
8
knockouts are removed for drainage and electrical connections.
NOTE: For Horizontal installation an auxiliary drain pan must be
proper knockouts are removed for drainage and electrical
connections.
installed.
NOTE: For Horizontal installation an auxiliary drain pan must be
installed.
C
D
Horizontal Left
Fan assembly rotation required
E
F
9.D. Downflow Installations:
INCORRECT
5/8"
(15mm)
DETAIL A
Tube Length
13
14
4.9 in. (125 mm)
8
9
10
6.9 in. (175 mm)
REATTACH
MOTOR
BRACKETS
ON BOTTOM
9
10
PRIMARY DRAIN
3/4" FPT
AIRFLOW
MITSUBISHI ELECTRIC CORPORATION
Downflow installation requires
PLASTIC TIE
PLASTIC TUBE
D
DIM.mm
SCALE
D
0.200
CH
15
NTS
DE
11
12
11
12
C
Auxiliary
drain pan
Step.2
A. Remove t
ITEM
MOD
B. Unplug th
COMMERCIAL
board and ro
WORK
rubber gromm
CASTING
C. Remove t
PRESS WORKIN
already done
GAS CUTTING
13
SHEARING
D. Slide the