Télécharger Imprimer la page

Roger Technology AGILIK Serie Instructions Et Avertissements Pour L'installateur page 25

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
11
INSTALLING THE FLASHING LED CIRCUIT OF THE BARRIER
ASSEMBLY HEAD (AG / BLED)
To install the 4-quadrant flashing LED on the head of the barrier assembly,
proceed as follows and what is shown in Figure 19.
-
Cut off the power from the automation, insert the key and release
the inspection door sealing hook attached to automation cover.
-
Remove the 2 fixing screws of the head of the barrier and
remove it completely, paying attention to the ground wire, which must be
disconnected.
-
By overturning the complete head we can see the slots where
the 4-quadrant LED circuit should be installed, which must be correctly
positioned in their slots, using the 2 fixing screws for each quadrant supplied,
avoiding passing the cables between the quadrants on the side where the
slot of the latch of the inspection door is located. See point "X".
-
The final part of the 4-quadrant LED circuit is inclusive of the
connection plug. The wiring is also provided, which must be connected
directly to the control unit. To make this connection, pass the connecting
cable with the connection plug to the unit box under the box through the
cable hole and connect it correctly to the unit in the hall dedicated input.
Finally, connect the two connection plugs to each other.
Provide power and enter into the programming of the unit AG/
-
CTRL and in in extended mode, position yourself in parameter No. 78 and
configure the desired flash mode.
-
Tightly and correctly close the cover of the box of the unit,
reposition the aluminium cover of the barrier assembly in the correct
direction, close and attach the inspection door and fix the two final screws
of the cover of the aluminium head.
12
CONNECTING THE PHOTOCELLS IN THE BARRIER ASSEMBLY
On both sides of the barrier body, it is possible to install the photocells of
the G90 series and largely the G90/F2ES photocells Pair of photocells for
external sync.
In both sides, the photocells can be installed at two heights of 50 cm or 100
cm from the bottom of the column, see Figure 20.
To install the photocell, cut off the power from the barrier, remove the cover
of the head and open the inspection door.
Position yourself over the desired photocell, loosen the two screws that hold
the plastic cover from the inside of the barrier body, fasten the photocells
to the side of the barrier cables by passing the cables upwards, avoiding the
wiring in a way that disturbs the movement of the automation. Use the cable
gland, located under the box containing the control unit and connect it to
the unit into the dedicated input.
13
INSTALLATION AND CONNECTION OF THE EMERGENCY
BATTERIES MODULE
The battery module B71/BCHP should be connected and installed inside the
cabinet, it should be carried out as shown in Fig. 21.
The galvanized steel support of the battery holder box must be inserting in
one of the two side niches on the right or left. Please note that it should be
assembled on the opposite side of the balance spring.
To electrically connect the battery to the unit, consult the instructions
manual of the installed battery module.
Ensure the battery's power cable so that it does not suffer damage during
the movement of the mechanical parts inside the cabinet.
14
CONNECTING AND PROGRAMMING THE CONTROL UNIT
For connections and programming of the electronic control unit, refer to the
instruction manual of the installed control unit, AG/CTRL supplied inside the
automatic barrier, together with the installation manual in question.
All manuals and user guides at all-guides.com
19
21
X
20
RX
TX
TX
RX
25

Publicité

loading