Installation Instructions - Bradley Halo S19214 Serie Installation

Masquer les pouces Voir aussi pour Halo S19214 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
1
Assembly — Connect Base and Eyewash
Standard eyewash unit is shown. Other units are similar.
Connect components before securing the base to the floor. When connecting
components, use the rubber grip pad (provided) around pipes to prevent marring.
Apply pipe sealant (supplied by installer) to all male-threaded pipe joints, making
sure not to get any excess over the edge of the pipes.
BSPP = British Standard Pipe Parallel Thread (not available in the U.S.)
Halo unit with standard
drain option
(3) Ø
" (10mm) holes on
3
8
Ø 8" (203mm) bolt circle
Bradley • 215-1685 Rev. M; ECN 13-05-023
½" NPT below supply
inlet, or ½" BSPP
Adapter when option
is specified
20½"
(521mm)
pipe length
1¼" NPT drain
outlet or 1-1/4"
BSPP Adapter
when option is
specified
For optional foot pedal
installation, the base
must be positioned
so that the hole in the
base is perpendicular
to the user .
³⁄₈" bolts and anchors
supplied by installer .
Halo unit with 24"
drain option
1/22/2015
S19214
½" NPT below
supply inlet, or ½"
BSPP Adapter
when option is
specified
1¼" NPT
drain outlet
or 1-1/4"
BSPP
Adapter
when option
is specified
12¾"
(324mm)
pipe length
9

Publicité

Table des Matières
loading

Table des Matières