Supplies Required - Bradley Halo S19214 Serie Installation

Masquer les pouces Voir aussi pour Halo S19214 Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S19214

Supplies Required:

(3)
" floor anchors and bolts
3
8
Teflon tape and pipe sealant
30 PSI (2 .0 bar) min/90 PSI (6 .1 bar) max flow pressure
125 PSI (8 .6 bar) max static pressure
Piping to ½" NPT (BSPP) water supply inlet (30–90 psi [2 .0-6 .1 bar])
Piping to 1¼" NPT drain outlet on unit (if included with unit)
OPTIONAL: sign-mounting hardware
DVGW certified teflon tape (for DVGW certified models only)
Local codes may require the installation of a backflow prevention valve to complete proper installation.
Compliance with local codes is the responsibility of the installer. Valve must be tested annually to verify that it
is functioning properly. Backflow prevention valves are not included with the fixture and may be supplied by the
contractor or purchased from Bradley Corporation.
4
1/22/2015
Bradley • 215-1685 Rev. M; ECN 13-05-023
Installation

Publicité

Table des Matières
loading

Table des Matières