Télécharger Imprimer la page

AE Hercules Guide D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

700-1250W STADIUM LIGHT
INSTALLATION INSTRUCTIONS
Step 1. Ensure all POWER is turned OFF.
Step 2. Determine a suitable mounting location and
mark the surface in accordance with the fixture's
mounting bracket (Figure 7).
Step 3. Place the luminaire flush with the mounting
surface and secure using 2x M20 bolts, lock-washers
and nuts. Tighten until the luminaire fixture is in the
proper orientation and fixed (Figure 8).
Step 4. Loosen the binding bolts on opposite sides of
the fixture and position the lamp head at the
desired orientation. Fix and secure by tightening the
binding bolts (Figure 9).
Step 5. Perform the wiring assembly as indicated in
Figure 6.
Step 6. Turn ON the POWER to the fixture to
complete the installation process.
7
9
ERALUX Incorporation All Rights Reserved. Any information provided is subject to change without notice. All values
are typical values when measured under normal laboratory conditions.
5
6
8
HERCULES
INSTALLATION GUIDE
04

Publicité

loading