Télécharger Imprimer la page

AE Hercules Guide D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

VISOR INSTALLATION INSTRUCTIONS
Step 1. Ensure all POWER is turned OFF.
Step 2. Have all components removed from the box
and set up neatly.
Step 3. Place the visor onto the front housing of the
LED fixture, and line up the visor holes with the screw
holes on the fixture housing (Figure 1).
Step 4. Using 5x M5x12mm hex screws, secure the
visor to the fixture by tightening the screws.
300W-500W STADIUM LIGHT INSTALLATION INSTRUCTIONS
Step 1. Ensure all POWER is turned OFF.
Step 2. Determine a suitable mounting location and mark the surface in accordance with the fixture's
mounting bracket (Figure 2).
Step 3. Place the luminaire flush with the mounting surface and secure using 2x M20 bolts, lock-washers and
nuts. Tighten until the luminaire fixture is in the proper orientation and fixed (Figure 3, 4).
2
Step 4. Loosen the binding bolts on opposite
sides of the fixture and position the lamp head
at the desired orientation. Fix and secure by
tightening the binding bolts (Figure 5).
Step 5. Perform the wiring assembly as indicated
in Figure 6.
Step 6. Turn ON the POWER to the fixture to
complete the installation process.
ERALUX Incorporation All Rights Reserved. Any information provided is subject to change without notice. All values
are typical values when measured under normal laboratory conditions.
1
3
4
HERCULES
INSTALLATION GUIDE
03

Publicité

loading