LAMS ALLIUM 4,90 M2 Notice De Montage page 34

Table des Matières

Publicité

FIXING THE GREENHOUSE BASE TO THE GROUND
FIXING ON SOIL (POINT FOUNDATION)
• Position the greenhouse base in the desired location at a level position.
• Locate the base legs as shown bellow.
• Mark a 300 x 300 mm square around the base legs and dig 450 mm deep.
• Place the greenhouse base, level it and ll the holes with concrete.
3788 mm
(2544 mm
2544
2544
1272 mm
1244 mm
FIXING ON CONCRETE SLAB
3788 mm
(2544 mm
2544
Niveau 0 - sol fini
+
1244
mm)
1272 mm
Niveau 0 - sol fini
+
1244
mm)
A
Earth or concrete lling
1922
It is strongly recommended
to ll the holes with concrete
for a better hold on the ground.
OR
Detail A-A
A
It remains to your free choice and decision to
use the suitable fastening means according to
the supports you chose (wood border, building
stones, cement plates etc.)
34
300 mm
Rawplug fastening inside
the greenhouse base
Screws and rawplugs
not provided
300 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Allium 7,30 m2

Table des Matières