Handle Installation - Black & Decker Price Pfister Portola 49 Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7
7E
7B
7A
7D
7C
7 HANDLE FLANGE ATTACHMENT
Place Plastic Ring (7A) and Flange (7B) over Valve Body (7C) covering the Valve Body
Washers (7D). Secure by threading Plastic Nut (7E) onto the Valve Body (7C).
8
8E
8D
8C
8A
8B

8 HANDLE INSTALLATION

With valves in "CLOSE" position, place Handle Hub (8A) onto Valve Stem (8B), connect
Lever (8C) onto Handle Hub (8A).Attach and secure with Screw (8D). Attach Decorative
Button (8E).
7E
7B
7A
7C
7D
8E
8C
8D
8A
8B
ENGLISH
9
9B
9F
9 SPOUT BODY ATTACHMENT
Insert Lift Rod (9A) into hole at the back of Spout Body (9B). Apply plumber's putty
into putty groove in bottom of Seal Ring (9D). Place Washer (9C) and Seal Ring (9D)
against the bottom of Spout Base (9E). Place Spout Base (9E) against the bottom of
Spout Body (9B). With Spout Body (9B) facing forward, carefully install the Lift Rod
(9A) and Shank (9F) through the center hole of sink (9G).
10
10A
10 SECURING SPOUT BODY
From underneath sink, secure Spout Body (10A) by placing Metal Washer (10B) and
7
threading Long Nut (
/
16
bumps on Metal Washer (10B) are facing up. Make sure Lift Rod (10E) moves freely.
Firmly hand tighten Long Nut (10C). Secure Long Nut (10C) not to exceed a
Caution: Do not over tighten!
3
9E
9C
9D
9G
10E
10D
10B
10C
Hex.) (10C) onto Mounting Post (10D). Make sure that the
9A
9B
1
/
turn.
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Price pfister portola t49-rp0kPrice pfister portola t49-rp0y

Table des Matières