Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

I N S TA L L AT I O N
S T E P 2

Install the Fixture

1.
Feed the junction box through the hole in ceiling (see fig. 12).
fig. 12
2.
Fold the mounting springs upward and slide the fixture into the hole in the ceiling. Once above the
ceiling, the spring arms will pull the fixture the rest of the way to the ceiling surface (see fig. 13).
Spring arms can pinch fingers when engaged.
fig. 13
3.
Restore power to the circuit. The fixture will turn on to a 3000 K warm white.
continued on next page
10 | D4R INSTALLATION GUIDE
P/N 3662345 Rev B
© 2019 Ketra, Inc. All rights reserved.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

D4r-fx-rd

Table des Matières