Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1
STANDARD WALL INSTALLATION
n
See Roughing-in diagram before starting.
Remove the PLASTER GUARD (8) for proper installation.
n
Mount VALVE BODY to cross brace (2" X 4") with-in wall. Use wood screws to secure VALVE BODY to brace.
n
Connect HOT and COLD water supplies per connection method of selected valve.
n
Connect RISER PIPE (1) to VALVE BODY (2) top outlet marked "UP".
n
Connect TUB FILLER PIPE (3) to bottom outlet.
n
Install PLASTER GUARD (8) back onto the valve. Only remove PLASTER GUARD (8) when ready to install trim Kit.
n
Finished wall should allow for a 4" diameter opening (Use PLASTER GUARD for guidance)
n
Screw driver stops are primarly used to shut water off. To shut "HOT" or "COLD" water using a flat head screw driver,
n
turn the head of the screw vertically. And to turn the water back on, turn the screw horizontally.
CAUTION: After valve installation, inspect the VALVE BODY for any debris. It can damage Pressure Balance
Valve cartridge.
NOTE: For back to back installation, follow steps mentioned above. Reversal of Hot/Cold water supplies is
accomplished by rotating cartridge (supplied with trim) 180° during installation.
HOT
NOTE: TO AVOID SHOWER RISE OR
OTHER RELATED ISSUES, DO NOT
USE PEX CONNECTIONS AT THE TUB
OUTLET CONNECTING TO THE TUB
SPOUT.
Turn off hot and cold water
CAUTION
supplies before beginning.
CROSS BRACE
1
2
6
COLD
SERVICE
STOPS
3
WOOD
SCREWS
8
- 2 -

SIDE VIEW

3-1/2"
(100 mm)
7/8" TO 2"
(22 mm to
50 mm)
2 x 4
Cross
Brace
2-3/4" MAX.
(69 mm)
1-3/4" MIN.
(45 mm)
M965907 Rev. 1.2 (8/19)
4"
(101 mm)

Publicité

Table des Matières
loading

Table des Matières