NewAge Products Performance Plus 2.0 Serie Instructions De Montage page 13

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Hanging Cabinets on Studded Wall
3
Planning the general position of cabinets. (cont.)
Step C.
Measuring up from the line marked in Step A, make a horizontal mark
at the following heights where they intersect the wall stud marks to
determine where the top of the cabinet will be (and where the
hanging bracket will be installed).
1. Locker: Measure 80" vertically from base line and mark at stud locations.
2. Base: Measure 32.25" vertically from base line and mark at stud locations.
3. Wall cabinets: Measure 80" vertically from base line and mark at stud
C
C
A
Height from Floor
Step D.
Ensure the cabinets will be at a suitable working height and that your
wall cabinets are not out of reach.
Note: The working surface of the base cabinets will be 1.25" higher than
the cabinet with the top installed.
locations (if installing flush with top of locker).
Floor
(cont.)
13

Publicité

Table des Matières
loading

Table des Matières