UTC HYDRA09-E2401M-B Guide D'installation Et Manuel Du Propriétaire page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.1)
SAFETY LABELING AND SIGNS
DANGER, WARNING AND CAUTION
The words DANGER, WARNING and CAUTION are used to identify
the levels of seriousness of certain hazards. It is important that you
understand their meaning. You will notice these words in the manual
as follows :
DANGER
Immediate hazards which WILL result in death or
serious injury.
WARNING
Hazards or unsafe practices which CAN result
in death or injury.
CAUTION
Hazards or unsafe practices which CAN result in
personal injury, product or property damage.
1.2)
HEATING WITH HOT WATER
Your HYDRA electric boiler was carefully assembled and checked in
our plant, so that it will deliver warmth and comfort to your home for
many years to come.
This manual is intended to provide the necessary information for the
installation of the unit, how it functions and explain security
measures which are particular to this type of equipment.
It is essential that the persons installing, operating or adjusting the
boiler carefully read this manual, in order to completely understand
and be familiar with the procedures to be followed.
Any questions relative to the operation, maintenance or guarantee
should be directed to the company where the equipment was
purchased.
Upon completion of the installation, this manual should be placed
back into its original envelope and kept near the boiler for future
reference.
SECTION 1
INSTALLATION
1.3)
DELIVERY
Upon delivery of the boiler, check the nameplate to be sure that
you have received the model with the correct rating and proper
voltage.
The following items are supplied with the unit:
-
-
-
-
1.4)
INSTALLATION
The installation of the unit must be in accordance with local codes
and other authorities having jurisdiction.
1.4.1)
Positioning
The unit must be installed in an area that is dry, non-corrosive,
without excessive dust, well ventilated and where the ambient
temperature does not exceed 80
The boiler can be installed directly on a wall, by way of the mounting
plate, supplied with the unit. Ensure that it is installed level and that
the clearances indicated below are respected (Table 1).
1.5)
CLEARANCES
The following clearances should be provided for the servicing of the
unit:
LOCATION
Access side to elements
Other side
Above
Front
1.6)
DISTRIBUTION SYSTEM
The proper functioning of your heating system is directly related to
the quality of the plumbing installation. Therefore, the entire
installation must be performed by qualified technicians.
See Figure 1 for the functions of the various boiler connections.
The heating system must be set-up to operate at a maximum
pressure of 28 psi and the operating temperature may range from
o
90
F to 200
Anti-freeze, specially designed for heating systems, may be added
to the boiler water to protect it from freezing.
A pressure relief valve, adjusted to 30 psi ;
A drain valve;
A ½ " NPT to ? " NPT reducer for the installation of
an air purge valve;
Modulating outdoor sensor
o
o
F (27
C).
Table 1
CLEARANCE
o
o
o
F (27
C to 93
C).
16"
6"
6"
24"
3

Publicité

Table des Matières
loading

Table des Matières