Repair Service; Putting Into Operation - Aquastic AQ IDE 75F Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 16
HAJDU Hajdúsági Ipari Zrt. as manufacturer hereby certifies that the water heater complies with
quality features described in the quality certificate.

REPAIR SERVICE!

In order to ensure continuous control or in case of failure of the water heater, please, turn to any service
shops contracted with out Company, as described by the „COMMERCIAL WARRANTY". If you are not
satisfied by the repair work performed by these service shops, please turn to the Customer Service of
HAJDU Hajdúsági Ipari Zrt.
Address: 4243 TÉGLÁS
Phone: (52) 582-700 Fax: (52) 384-126
1 installation and owner's manual
1 commercial warranty
Please, check these items at acceptance of the water heater.
DEAR BUYER!
This water heater equipped tank and indirect heating can be operated from either electric energy,
solar energy, or gas-based, coal-based or other based energy carriers.
INSTALLATION
The water heater has to be installed in a location protected from frost, next to the water supply
place. The installation location must be selected in a way that inlet and outlet pipes should be
connected easily with the least possible elbows, furthermore, the close cover and the active anode
should be demounted easily.
FIXING THE WALL MOUNTING WATER HEATER (for types AQ IDE...F)
The partition wall selected as the wall for the water heater to be mounted must bear the weight of
the water heater filled up with water, thus, in case of a thin wall, strengthening flat iron items should
be used (on the other side of the wall).
NOTE:
1.) In order to ensure exchange of the active anode, free room of 200 mm should be leaved
under the bottom cover.
2.) The vertical wall mountable water heater of 75 - 200 liter capacity can be placed on a 3
legged scaffold, which is delivered to the Client upon special request.
In order to ensure perfect stability to the water heater, it should be placed on the 3 legged scaffold
and mounted to the wall with the suspension leg, before being filled up with water.

PUTTING INTO OPERATION

Before connecting the water heater to the power supply system, it should be completely filled up
with water, with one hot water faucet kept open. This faucet should be closed when water outflow is
performed without noises in the pipes, in a regular way. Then the whole hot water pipeline should
be flushed gradually, through opening adequate faucets.
CONNECTION TO THE PIPELINE SYSTEM
Galvanized steel pipe can be used as hot water and cold water pipes.
IT IS AT THE RISK OF DEATH AND THEREFORE IT IS FORBIDDEN TO PUT THE
WATER TANK AND THE TEMPERATURE EXCHANGER UNDER A PRESSURE
LARGER THAN THE PERMITTED OPERATION PRESSURE (6 BAR)!
The product includes the following accessories within the packaging box:
EN
ATTENTION!
6/36

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aq ide 100fAq ide 120fAq ide 150fAq ide 200f

Table des Matières