hestan Aspire AGCKLPT Serie Mode D'emploi page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION OF NEW REGULATOR
1. The gas connection at the appliance must use a minimum 1/2" diameter flexible (semi-rigid)
stainless steel gas hose up to the fixed pipe / bulkhead fitting as shown below. The gas line
connectors must comply with the Standard for Connectors for Outdoor Gas Appliances and
Manufactured Homes, ANSI Z21.75 • CSA 6.27 , and suitable for outdoor installation. This
stainless steel gas connection shall be 6 feet (1.82 m) or less.
2. Connect the regulator/hose assembly to the 3/8" Flare (compression flare fitting) X 1/2" NPT
female adapter as shown. Use appropriate thread sealant on all connections. The hose as well as
the connectors must comply with the Standard for Connectors for Outdoor Gas Appliances and
Manufactured Homes, ANSI Z21.75 • CSA 6.27 , and suitable for outdoor installation.
NOTE: Locate the pipe and regulator assembly in such a way that the regulator cannot touch
the floor of the enclosure when disconnected from the LP cylinder. This is important so that no
contaminants can get into the large connection end. Also be sure all hoses are away from heat
sources and away from sharp edges which may cut into the hose and cause a leak.
3. Place the tank retention device on the floor of your island (enclosure). Temporarily place a
standard 20 lb. LP cylinder in the retention device and connect the regulator/hose assembly to
the cylinder. DO NOT OPEN THE GAS VALVE. Move the retention device to a convenient
location which allows for easy access to the cylinder shutoff valve, and does not stretch or kink
the hose. When you believe you have the device located correctly, mark the floor around the
device, disconnect the regulator and remove the cylinder from the island.
4. Using the holes provided in the retention device, secure it to the floor with screws (not included).
Use of stainless-steel screws is highly recommended.
5. Re-install the LP cylinder in the retention device and re-connect the regulator/hose assembly.
6. Proceed to LEAK TESTING section.
©2017 Hestan Commercial Corporation
EN
3

Publicité

Table des Matières
loading

Table des Matières