Télécharger Imprimer la page

AirKing AK960L Instructions D'installation

Chaufferette/lampe/veilleuse

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Model AK960L Heat/Light/Night Light
If you discover any missing components or damage call
1-800-465-7300 between 8:00 am and 3:30 pm eastern time
Monday to Friday
Read and save these instructions
IMPORTANT SAFEGUARDS
• IMPORTANT: Disconnect the power before cleaning,
servicing or performing routine maintenance.
If you are replacing an existing product, ensure the
power is disconnected before beginning this
installation.
Do not mount over tub or in shower stall
enclosure.
Not for use in kitchens.
• WARNING: To reduce the risk of fire or electric shock or
injury to persons observe the following:
Use this unit only in the manner intended by the
manufacturer. If you have questions, contact the
manufacturer.
Before servicing or cleaning the unit, switch power
off at the service panel and lock service panel to
prevent power from being switched on
accidentally. When the service disconnecting means
cannot be locked securely, fasten a prominent
warning device, such as a tag to the service panel.
Installation work and electrical wiring must be done
by qualified person(s) in accordance with all
applicable codes and standards, including fire-rated
construction.
When cutting or drilling into wall or ceiling, do not
damage electrical wiring or other hidden utilities.
NEVER place a switch where it can be reached
from a shower or tub.
Do not use this unit with any solid-state speed
control device.
Before beginning this installation, remove from the carton the
packaged grill and light lens, the heater' s housing and
mounting brackets and any loose packaging. Remove the
heater' s wiring compartment cover. Remove the light reflector
from the heater' s housing – it is held in place by a screw. Place
grill and lens as well as the heater' s wire compartment cover
and light reflector back in the carton until needed so they do
not get damaged.
AIR KING LIMITED, 110 GLIDDEN ROAD, BRAMPTON, ONTARIO, CANADA; TEL. 905-456-2033, 1-800-465-7300, FAX. 905-456-1015
INSTALLATION
INSTRUCTIONS
Mounting the Housing: New Construction
Using the Hanging Brackets
1. Insert the hanger bars in the slots provided in the housing.
2. Locate the heater housing between joists so that the
bottom of the heater will be flush with the finished ceiling.
3. Use screws or nails to secure the hanger bars to the ceiling
joists.
4. Remove the desired electrical knockout from the junction
box in the housing.
Using Side Mounting Tabs
1. Locate the heater housing next to a ceiling joist.
2. Use screws through the keyhole slots in the mounting tabs
to loosely position the housing in place.
3. Adjust the height of the heater so that the housing will be
flush with the finished ceiling. When the housing is properly
positioned, secure in place using screws or nails.
4. Remove the desired electrical knockout from the junction
box in the housing.
Mounting the Housing: Existing Construction
1. Determine the desired location for the heater.
2. Drill a small hole through the ceiling at the chosen location.
Stick the end of a coat hanger through the hole into the
attic to help locate the spot in the attic.
3. Check the chosen area from above to make sure that the
wiring can be installed and that the installation will not
interfere with any existing wiring.
4. In the attic, place the housing between ceiling joists at the
Fig 1.

Publicité

loading

Sommaire des Matières pour AirKing AK960L

  • Page 1 INSTALLATION INSTRUCTIONS Model AK960L Heat/Light/Night Light Mounting the Housing: New Construction If you discover any missing components or damage call 1-800-465-7300 between 8:00 am and 3:30 pm eastern time Using the Hanging Brackets Monday to Friday 1. Insert the hanger bars in the slots provided in the housing.
  • Page 2 INSTALLATION INSTRUCTIONS chosen location. Mark the ceiling for cutout by using the heater housing’ s flange as a template. Make the cutout. AK960 WIRING DIAGRAM 5. Install the housing in the opening using hanger bars or mounting tabs as described above. 6.
  • Page 3 INSTALLATION INSTRUCTIONS Chaufferette/Lampe/Veilleuse Modèles AK960 Si vous découvrez des éléments manquants ou des dommages, une vis. Remettez la grille et la lentille ainsi que le couvercle du compartiment de càblage de chaufferette et le réflecteur d’é- veuillez appeler 1-800-465-7300 entre 8 H et 15 H 30 Heure clairage dans le carton jusqu’à...
  • Page 4 INSTALLATION INSTRUCTIONS Montage Du Boîtier: Construction Existante lentille en poussant sur les 2 pattes qui la retiennent en place dans la grille. 1. Déterminez l’emplacement désiré pour la chaufferette. 4. Fixez la grille et la lentille au boîtier de chaufferette à 2.