Aerus Air Scrubber Advanced Mode D'emploi page 7

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
FIBERGLASS DUCTWORK INSTALLATION (CONTINUED)
5 . Remove backing from the mounting plate adhesive
gasket .
7 . Insert (4) toggle bolts into 3/8" holes in duct . Be sure
toggle anchors open after inserting .
9 . Insert unit into opening . Be sure the air will pass through
the ActivePure® Cell honeycomb matrix . Cell position can
be changed if needed for vertical air flow .
11 . Power Connection Requirements: This device is designed to operate using a 24 VAC, 40Va transformer . Transformers
supplied with a straight cooling or HVAC system may be used to power the device but must be verified it's capable of
handling the additional device load prior to installation . If the system transformer is not capable of handing the extra load,
a separate 24 VAC, 40Va transformer MUST be used . Do not connect the device to any power source with a voltage less than
22 VAC and a maximum of 32 VAC . Doing so will cause damage to the device .
NOTE: Unit requires continuous power . Do not install where power to the unit will be cycled on and off .
6 . Insert (4) 2" Threaded bolts into screw holes at corners
of mounting plate . Attach (4) toggle bolt anchors to
ends of threaded bolts .
8 . Center large opening in the mounting plate over
3 .5" opening in duct and press plate to duct .
The adhesive gasket will hold the mounting
plate into place . Tighten toggle bolts - DO NOT
OVERTIGHTEN.
10 . Secure the unit to the mounting plate with four
(4) thumb nuts .
Stud
7

Publicité

Table des Matières
loading

Table des Matières