Installation Tips - NewAge Products BOLD 3.0 Guide D'installation

Masquer les pouces Voir aussi pour BOLD 3.0:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Drill a pilot hole using a 3/16" drill bit. Using a 1/4" x 2-1/2" lag bolt, one 1/4" ID Fender
6
Washer and a 7/16" socket, bolt the Wall Shelf into the Stud. Repeat for remaning studs and
second shelf.
Parts Needed:
Lag Bolt (1/4"dia x 3")
Lag Screw
(1/4" dia x 2-1/2")
Fender Washer
7/16" Socket
(1/2" OD)
7
Using two M5 Phillips bolts, screw the Light Valance into the Wall Shelf hex rivet. Repeat
for all remaning Light Valances.
Parts Needed:
M5 Bolt
(M5 x 12mm)
Light Valance

Installation Tips

Note:
The Top Shelf is capable of being installed upside down if desired.
To install the Top Shelf upside down, flip the shelf to where the top of the shelf is now facing
1
down. Insert the 1/4" Hex bolt and washer through the bottom mounting holes and tighten
with a lock nut inside the cabinet. Continue steps 3-5 to complete installation.
Parts Needed:
Lock Nut
Hex Bolt
(1/4")
(1/4" dia x 5/8")
6
Washer
(1/4" ID)

Publicité

Table des Matières
loading

Table des Matières