Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

!
CAUTION: At least two installers are
required due to the weight and size of the
hood.
2. Plum and mark center line.
not tighten all the way. Note: Wood blocking may need
to be added behind the drywall if no studs are present.
Wall anchors may also be used but check local codes
for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result
in personal injury or damage to the cooking surface or
counter.
bracket to hood. Reposition electronics mounting bracket as
previously removed screws.
9. Hang hood onto the mounting screws and hand tighten each
10. Center and attach duct cover mounting bracket to wall just
11. Install electrical and duct work. Seal duct work with aluminum
duct tape. Re-install electrical junction box with cable lock and
12. Power up hood and check for leaks around duct tape.
duct cover upwards and secure to duct cover
M3.5 x 8 screws.
* If using hood in recirculating mode you must secure the air diverter
plate onto wall before installing duct work and duct covers. Turn
to page 10 for more details.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.

Cable Lock

be required by local codes. Check with local
requirements and codes, purchase and install
appropriate connector if necessary.
All manuals and user guides at all-guides.com
9
11 1/8"
14 3/4"
26" min
Brackets are
pre-installed
1
2
FIG. A
2
Cable Lock
1
3
Motor Housing
FIG. B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Zephyr verona zvo-m90ag

Table des Matières