Service And Maintenance - Ferroli DIVAcondens F24 Instructions D'utilisation, D'installation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. SERVICE AND MAINTENANCE

4.1 Adjustments
Gas conversion
The unit can work on natural gas or LPG and is factory-set for use with one of these two
gases, as clearly shown on the packing and data plate. Whenever a different gas to that
for which the unit is arranged has to be used, the special conversion kit will be required,
proceeding as follows:
1.
Disconnect the power supply ahead of the boiler and close the gas cock;
2.
Replace the nozzles at the main burner and pilot burner, fitting the nozzles indicated
in the technical data table in cap. 5, depending on the type of gas used
3.
Connect the power supply ahead of the boiler and open the gas cock;
4.
Modify the parameter for the type of gas:
put the boiler in standby mode
press the DHW buttons details 1 and 2 - fig. 1 for 10 seconds: the display shows
"b01" flashing.
press the DHW buttons details 1 and 2 - fig. 1) to set parameter 00 (for opera-
tion with natural gas) or 01 (for operation with LPG).
press the DHW buttons details 1 and 2 - fig. 1 for 10 seconds.
the boiler will return to standby mode
5.
Adjust the minimum and maximum pressures at the burner (ref. relevant para-
graph), setting the values given in the technical data table for the type of gas used
6.
Apply the sticker, contained in the conversion kit, near the data plate as proof of the
conversion.
TEST mode activation
Press the heating buttons (detail 3 - fig. 1) together for 5 seconds to activate the TEST
mode. The boiler lights at the maximum heating power set as described in the following
section.
The heating and DHW symbols (fig. 14) flash on the display; the heating power will ap-
pear alongside.
fig. 14 - TEST mode (heating power = 100%)
Press the heating buttons (details 3 and 4 - fig. 1) to increase or decrease the power
(Min.=0%, Max.=100%).
If the TEST mode is activated and enough hot water is drawn to activate the DHW mode,
the boiler remains in TEST mode but the 3-way valve goes to DHW.
To deactivate the TEST mode, press the heating buttons (details 3 and 4 - fig. 1) together
for 5 seconds.
The TEST mode is automatically deactivated in any case after 15 minutes or on stopping
of hot water drawing (if enough hot water has been drawn to activate the DHW mode).
Adjustment of pressure at the burner
Since this unit has flame modulation, there are two fixed pressure values: the minimum
and maximum, which must be those given in the technical data table according to the
type of gas.
Connect a suitable pressure gauge to pressure point "B" located downstream of the
gas valve
Remove the protection cap "D" undoing screw "A".
Operate the boiler in TEST mode.
Adjust the power to the max. value.
Adjust the max. pressure with screw "G", clockwise to increase the pressure and
anticlockwise to decrease it
Disconnect one of the two Faston connectors from the modureg "C" on the gas
valve.
Adjust the min. pressure with screw "E", clockwise to decrease the pressure and
anticlockwise to increase it.
Reconnect the Faston connector detached from the modureg on the gas valve.
Check that the maximum pressure has not changed.
Refit protection cap "D".
To end the TEST mode repeat the activation sequence or wait 15 minutes.
After checking or adjusting the pressure, make sure to seal the adjust-
A
ment screw with paint or a specific seal.
6
EN
All manuals and user guides at all-guides.com
C
D
Heating power adjustment
To adjust the heating power, switch the boiler to TEST mode (see sec. 4.1). Press the
heating buttons detail 3 - fig. 1 to increase or decrease the power (min. = 00 - max. =
100). Press the reset button within 5 seconds and the max. power will remain that just
set. Exit TEST mode (see sec. 4.1).
Lighting power adjustment
To adjust the lighting power, switch the boiler to TEST mode (see sec. 4.1). Press the
DHW buttons (detail 1 - fig. 1) to increase or decrease the power (min. = 00 - max. = 60).
Press the reset button within 5 seconds and the lighting power will remain that just set.
Exit TEST mode (see sec. 4.1).
4.2 Startup
Before lighting the boiler
Checks during operation
cod. 3541F450 - Rev. 03 - 04/2015
DIVAcondens F24/F28
E
G
fig. 15 - Gas valve
A - Protection cap screw
B - Pressure point downstream
C - Modureg cable
D - Protection cap
E - Min. pressure adjustment
G - Max. pressure adjustment
Check the seal of the gas system.
Check correct prefilling of the expansion tank.
Fill the water system and make sure all air contained in the boiler and the system
has been vented.
Make sure there are no water leaks in the system, DHW circuits, connections or boil-
er.
Check correct connection of the electrical system and efficiency of the earthing sys-
tem.
Make sure the gas pressure for heating is that required.
Make sure there are no flammable liquids or materials in the immediate vicinity of
the boiler
Switch the unit on.
Check the tightness of the fuel circuit and water systems.
Check the efficiency of the flue and air/fume ducts while the boiler is working.
Make sure the water is circulating properly between the boiler and the systems.
Make sure the gas valve modulates correctly in the heating and domestic hot water
production stages.
Check correct boiler lighting by performing various tests, turning it on and off with
the room thermostat or remote control.
Make sure the fuel consumption indicated on the meter matches that given in the
technical data table in cap. 5.
Make sure that with no demand for heating, the burner lights correctly on opening a
hot water tap. Check that in heating mode, on opening a hot water tap, the heating
circulating pump stops and there is regular production of hot water.
Make sure the parameters are programmed correctly and carry out any required
customisation (compensation curve, power, temperatures, etc.).
B
C
D
A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Divacondens f28

Table des Matières