Télécharger Imprimer la page

Leuze BCL 21 Mode D'emploi page 20

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
Commissioning
2
Mounting
Installation via holes for M3-sized screws in the case or via a mounting system
BT 20 or BT 21 (accessory).
D Mounting thread with thread depth of max. 4mm
E Optical axis (perpendicular beam exit - 90°)
F Optical axis (straight beam exit - 0°)
G Laser beam, opening angle adjustable
3
Electrical connection – Commissioning with factory settings
 Mount the BCL 2x and the corresponding connector unit.
 Connect the BCL 2x via the system plug.
 Connect the voltage supply and, if necessary, the interface and the inputs/out-
puts.
 As soon as the green PWR/Ready LED illuminates, activate the laser via input
SE1 or with online command '+' via the interface.
 Hold the example bar codes
reading.
 The laser beam switches off following successful decoding.
LED indicators
LED name
LED color
State
No voltage
Initialization (after reset)
System ready
Reading gate active
Hardware error (defective motor, laser,
system, etc.)
autoConfig/teach-in
Service interface active
at a suitable distance from the BCL 2x for
5
PWR/
Ready
green
off
flashing
(cycle1)
on
on
off
flashing
(cycle1)
on
ERR/
DEC/
Error
Decode
red
yellow
off
off
off
off
off
off
off
on
on
flashing
(cycle2)
flashing
(cycle2)
EN
-
-
-
20

Publicité

loading

Ce manuel est également adapté pour:

Bcl 22