7. Signalling
7 Signalling
Version
WNM.RN.R.IO
WNM.RN.CC.IO
WNM.RN.CR.IO
WNM.RN.EC.IO
22 / 88
6. Connect the power supply.
The LED lights up in green.
9
7. Start up the RouterNode with the WaveNet Man-
ager and LSM.
LSM displays the network ID (Group ID/Member
9
ID) in the window "Administer WaveNet node".
RouterNode ready for use.
9
Signalling
Flashing, ~1.5 Hz
(green LED)
Flashing (green LED)
Continuous light (red
LED)
RouterNode (GatewayNode)
Meaning
Ready to receive.
Data transmission.
Software problem.
Problem with the
power supply.
Hardware problem.
EN