Télécharger Imprimer la page

EKKO PUMPS PAS400-P10MKIT Traduction Des Instructions D'origine page 13

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4
SYMBOLS
Denotes risk of personal
injury or damage to the tool.
Read manual before use.
Size : Foreign bodies
Immersion depth max.
In accordance with essential
applicable safety standards
of European directives
IPX*
Degree of protection IP
ELECTRICAL SAFETY
Always check that the power
supply corresponds to the
voltage on the rating plate.
DESCRIPTION
1. motor housing
2. water inlet
3. water outlet
4. cable & plug
5. floating switch
6. carrying handle
INSTALLATION
Connecting the outlet pipe
Connect the outlet pipe to the outlet
opening.
Please note!
You should never install the pump by suspending it
unsupported from its delivery pipe or power cable.
The submersible motor pump must be suspended
from the specially provided handle or be placed on
the bottom of the shaft. To guarantee that the pump
works properly, the bottom of the shaft must be kept
free of sludge and dirt of all kinds.
If the level of water sinks too far, any sludge in the
shaft will dry out quickly and stop the pump from
starting up. ,Therefore it is necessary to check the
submersible motor pump regularly (by carrying out
start-up tests). The floater is adjusted in a way that
the pump can immediately be started
Note!
The pump shaft should have minimum dimensions
of 40 x 40 x 50 cm, so that the floating switch can
move freely.
Delivery height max
Mains supply
Your new submersible pump is equipped with a
shock-proof plug according to regulations. The
pump is designed to be connected to a 230V - 50
Hz earthed socket.
Important Note!
If the mains cable or plug suffers any damage from
external action, repairs to the cable are prohibited.
SETTING TO WORK
After having read these instructions carefully, you
can set your pump to work, reconsidering the
following:
Check if the pump rests on the ground of the
shaft.
Check of pressure cord has been attached
properly.
Check if electrical connection is 230 V - 50 Hz.
Check if socket is in good condition.
Make sure that water and humidity can never
come to the mains supply.
Avoid pump running dry.
Before installing or moving
the pump always remove the
mains plug from the wall
Switching on and off
To switch on the pump, insert the mains
plug in the wall socket.
To switch off the pump, remove the mains
plug from the wall socket.
The pump only operates when the float
switch floats. This prevents the pump
from running dry during operation.
CLEANING AND MAINTENANCE
Before performing any work
on the equipment, pull the
Never use solvents such as
petrol, alcohol, ammonia
water, etc. These solvents
may damage the plastic
Service
The pump is maintenance free. Defects must
only be repaired by an authorised service
station.
Cleaning
When the pump is often transported in the course
of operation, it should be cleaned out with clear
water after every use.
In case of stationary installation, the function of
the bating switch should be checked every 3
months.
socket.
Attention !
power plug.
parts.
13

Publicité

loading