Télécharger Imprimer la page

ACIS TOP BLOW Mode D'emploi page 7

Publicité

Les langues disponibles

Les langues disponibles

FILTRES SOUFFLES TOP
TOP BLOW MOULDED FILTERS
Description
1
6-way TOP valve
2
Pressure gauge, seal
3
Clamp
4
Screw, nut
5
Tank
6
Central pipe
7
Stainer
8
Drain plug
9
Base
10
Valve seal / tank
Illustration : Centring plug
3.2 LOADING THE SAND (washed and dried)
▪ Ensure that the 8 strainers (7) are securely tightened,
▪ Ensure that the vertical pipe (6) is correctly located in the center of the strainers and that the centering plug (see above)
has been installed
▪ Cover the strainers with water (1/3 of the filter) in order to slow the falling sand
▪ For the sand carefully through the upper opening (please refer to the table for the weight and size grading),
▪ Remove the centering plug. It will not be required again. Flatten the surface of the sand,
▪ Make sure that no sand has fallen into the central pipe (6) and clean off any residues from the filter tank.
A
B
Model
mm
mm
6 m3/h
757
400
10 m3/h
845
527
15 m3/h
950
627
20 m
3
/h
1020
703
15 Rue des Marais 44310 ST Philbert de Gd Lieu – Tel. 02 40 59 95 35 – www.acis-france.com
Sewer
Sand
Couplings
Size grading
kg
1''
1/2
35
0.5
1''
1/2
85
0.8
1''
1/2
145
mm
1''
1/2
210
à
Pump
Sewer
Swimming-pool
10
7

Publicité

loading

Produits Connexes pour ACIS TOP BLOW