Unpacking / Putting Into Operation - PAXXO Pactosafe 4.0 Traduction De La Notice D'instructions Originale

Masquer les pouces Voir aussi pour Pactosafe 4.0:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Unpacking / Putting into operation

Pactosafe is delivered partly mounted, in a box.
The stand and the mechanism have to be mounted together, the foil has to be
inserted and the foot pedal and cable have to be connected.
The packing must be recycled.
1
Remove all components from their packaging.
Check that all components are present, see pictures 1-6.
Set the stand (1) to the desired height using the four screws and nuts
(2). Connect the power adaptor (3) or battery charger (4) to a wall
socket with the same specification as indicated on the label on the
power adaptor or battery charger. N.B.: The picture is only an
example. The sign may vary depending on the country where the
Pactosafe is to be used.
Open the lid and insert the foil cassette (5) (ordered separately).
Close the lid.
Fit the foot pedal on the front (6).
Make sure that the feeder wheels are gripping the foil.
Turn on the switch. N.B.: The machine takes approx. 5 seconds to
start up.
Press the foot pedal and check that the foil is feeding down on both
sides and that it is being welded.
Check the welding result against the pictures in Section 10.
The Pactosafe is now ready for operation.
Paxxo AB / Bjurögatan 35, SE-211 24 Malmö, Sweden / Tel: +4640186025/ Fax: +4640183736 /www.paxxo.com
Knobs
11

Publicité

Table des Matières
loading

Table des Matières