Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Before you begin - Read these instructions completely and carefully.
IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES.
Note to Installer – Be sure to leave these instructions with the Consumer.
Note to Consumer – Keep these instructions with your Owner's Manual for future reference.
RAVTRANS Kit will fit the following GE Appliances plenum kits: RAVWP6, RAVWP8, RAVWP12 and RAVWP15.
RAVTRANS kit is required when replacing an AZ75/AZ85 series vertical air conditioner with a new AZ90/91
series vertical air conditioner. Differences in chassis designs between the AZ75/AZ85 series and AZ90/91
series require careful installation planning. Changes in drain exit locations and drain routing, electrical
connections, platform height, conditioned air duct location and additional space requirements for installation of
RAVTRANS kit are all items that need to be considered when replacing a AZ75/AZ85 series unit with an AZ90/91
series unit.
Installation of a new AZ90/91 series unit with a transition plenum will take up approximately 2-1/2" of additional
closet space once the unit is fully installed. Before starting the conversion be sure there is adequate closet
space to meet the manufacture's recommend minimum clearance requirements.
Parts Included
Transition Plenum
6 - #8 3/4" hex head sheet metal screws
4 - Pieces of Insulation
1 - Drain Pan
(2) Top and Bottom
Pieces of Insulation
Installation
Overview
(Small Chassis Shown)
Existing
Architectural
Louver
RAVWP6 – 6" D x 19-3/4" W x 32" H
RAVWP8 – 8" D x 19-3/4" W x 32" H
RAVWP12 – 12" D x 19-3/4" W x 32" H
RAVWP15 – 15" D x 19-3/4" W x 32" H
GE is a trademark of the General Electric Company. Manufactured under trademark license.
(2) Side Pieces
of Insulation
Exterior/
Outside Wall
Existing
Wall Plenum
Installation Instructions
for your new
RAVTRANS
Transition Plenum
Flange
Mounting
screw
Unit Side
locations
Transition
Wall Plenum
Insulation
Transitional
Wall Plenum
Existing Wall
Plenum Side
Drain Pan
Unit
Drain Pan
31-30824-2
06-17 GEA

Publicité

loading

Sommaire des Matières pour GE RAVTRANS

  • Page 1 Changes in drain exit locations and drain routing, electrical connections, platform height, conditioned air duct location and additional space requirements for installation of RAVTRANS kit are all items that need to be considered when replacing a AZ75/AZ85 series unit with an AZ90/91 series unit.
  • Page 2 Installation Instructions STEP 1 Prepare Installation Area by Removing AZ75/AZ85 Unit WARNING Risk of Electrical Shock, can cause injury or death. Before servicing, Inside Rigid switch power off at the service panel and lock the area to prevent power Wall Ductwork from being switched on accidentally.
  • Page 3 Installation Instructions STEP 3 Platform Height Adjustment 1. In most AZ75/AZ85 to AZ90/91 conversions the existing platform will need to be lowered to accommodate the new AZ90/91 vertical air conditioner. Having the correct platform height will ease installation of the unit by allowing the back of the unit to slide right into the transition plenum, the sealing gasket should be lubricated with soapy water or similar solution to reduce the friction between the side of the unit and the gasket.
  • Page 4 La trousse RAVTRANS est compatible avec les trousses de plenum GE Appliances suivantes : RAVWP6, RAVWP8, RAVWP12 et RAVWP15. La trousse RAVTRANS est requise dans le cas du remplacement d’un climatiseur vertical de séries AZ75/AZ85 par un nouveau climatiseur vertical de série AZ90/9. Des différences dans la conception de la carrosserie entre les séries AZ75/ AZ85 et la série AZ90/91 exige une planification minutieuse de l’installation.
  • Page 5 Instructions d’installation ÉTAPE 1 Préparez la zone d’installation en retirant l’appareil AZ75/AZ85 AVERTISSEMENT Risque de choc électrique pouvant causer des blessures ou le décès. Avant de Conduit procéder à un entretien ou une réparation, coupez l’alimentation électrique au intérieur rigide panneau de service et verrouillez son accès afin de prévenir une remise sous tension accidentelle.
  • Page 6 Instructions d’installation ÉTAPE 3 Ajustement de la hauteur de la plateforme 1. Dans la plupart des conversions AZ75/AZ85 à AZ90/91, la plateforme existante devra être abaissée pour s’adapter au nouveau climatiseur vertical AZ90/91. Une hauteur de plateforme appropriée facilitera l’installation en permettant à...

Ce manuel est également adapté pour:

Ravwp6Ravwp8Ravwp12Ravwp15