Overflow Plug Assembly - Bradley Verge LVLD3 Manuel D'installation

Masquer les pouces Voir aussi pour Verge LVLD3:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
2
Mounting Faucet Box and Valve
Supply Outlet
to Faucet
Battery Box
Inlet
A
WARNING! Water supply to Battery Box
Solenoid MUST be supplied
using a plastic hose (provided
by Bradley).
3

Overflow Plug Assembly

#10-24 Screw
Packing Washer
A
Assemble overflow drain
cap to basin as shown.
Bradley • 215-1779 Rev. E; ECN 16-08-008
Secure fittings to
wall or other at this
approximate location
Supply hose to battery box
inlet (Hose not shown for
Mount the faucet boxes to the wall at
these approximate locations. Refer
to faucet instructions for proper
connections.
C
Thermostatic
Supply Hose to
Mixing Valve
Thermostatic Mixing
Valve
clarity) 3 places
Secure the TMA valve
to the wall at the
B
location shown using
(2) #10 fasteners. See
rough-in section for
valve rough-in location.
Assemble the shutoff valves to
the hot and cold supplies. Attach
stainless steel 1/2" supply hoses
from the hot and cold shutoff valves
to the TMA valve.
O-Ring (125-111)
Overflow plug
Overflow Plug Prepack
Cold Supply
NONE Option
Hot Supply
(S45-2812)
6/3/2016
LVLD3
Plastic
Hose
9

Publicité

Table des Matières
loading

Table des Matières