Control And Starting Procedures; Priming The Pump - Imer Group RD 55 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. CONTROL AND STARTING PROCEDURES

■ Carefully read the sections «
manual.
□ Always install the pump on a flat and stable floor.

5.1. PRIMING THE PUMP

Your pump is a self-priming pump. A self-priming pump raises the water by its own means into the
suction pipe by pumping the air therein. For self-priming to work, it is imperative to fill the pump body
with water before starting.
□ Never attempt to operate the pump without priming water or the pump will overheat.
□ Extended dry operation will destroy the pump seal.
□ If the pump has been operated dry, stop the engine immediatly and allow the pump to cool
before adding priming water.
Before starting the engine, make sure to fill the pump with water:
1.
Screw off the priming cap [Fig. 13];
2.
Fill the pump fully with clear water [Fig. 14];
3.
Rescrew the priming cap.
□ Don't screw off the priming cap during operation of the pump to avoid damaging the equipment
and injuring persons.
□ Never run the pump without priming water, which will cause the pump to overheat.
38
SAFETY INSTRUCTIONS
WARNING
WARNING
WARNING
» and «
PRE OPERATION CHECKS
» in this

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

P52dJet70dSwt 50d

Table des Matières