Télécharger Imprimer la page

Installing The Solar System - Dometic BUTTNER MT 90 Instructions De Montage Et De Service

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 29
The side roof mounting supports are glued to the
vehicle roof without drilling. The solar panels are
screwed onto the side roof mounting supports and
are replaceable.The wiring to the interior is routed
through a pressurized water-tight roof duct.
The solar system can be extended by further solar
panels of the same power.
MT 180-2, MT 260-2, MT 420-2, MT 260-2 CDS,
MT 420-2 CDS: Both solar panels can be con-
nected to each other at one junction box.
Due to the higher solar panel voltage (VoC), the
solar system is equipped with an MPP solar char-
ger. The MPP solar charger is connected between
the solar panels and the vehicle batteries to ensure
the correct charging current of the batteries and to
protect the batteries against over voltage and
deep discharge.

Installing the solar system

!
WARNING! Electrocution hazard
Completely cover all solar panels with an
opaque material during installation to
prevent electricity from being gener-
ated.
A
NOTICE! Damage hazard
Ensure that the junction box and the roof
duct are properly sealed and that the roof
duct is glued tightly to the roof so that no
moisture can leak into the junction box or
through the roof.
Installation location
When selecting the installation location, consider
the following:
• The mounting surface must be even and stable
enough to support the solar panel.
• Ensure that the designated mounting surface is
sufficiently dimensioned.
• Ensure there is enough room to access the solar
panels and other fixed components for mainte-
nance.
• Ensure that any existing ventilation openings on
the vehicle and the rear ventilation of the solar
panel are not blocked.
12
• Shading can reduce the performance of the
solar system. Ensure that fixed components,
such as air conditioners or opened satellite
antennas, do not shade the solar panels.
• Choose a location with direct sunlight for opti-
mal performance.
• Place several solar panels as close to each other
as possible.
• Do not glue the side roof mounting supports or
roof ducts to rubberized surfaces (e.g. exterior
planking), as the adhesion of the glue is not guar-
anteed.
Preparing the installation
➤Mark and prepare the bonding surfaces, see
fig. 4, page 5 to fig. 7, page 5.
➤Strip the cable ends as follows (fig. 8, page 5):
– Outdoor cable 11 mm (2.5 mm²)
– Indoor cable 11 mm (4.0 mm²)
Connecting the solar panel (fig. 9,
page 5 to fig. 0, page 6)
Observe the following instructions when connect-
ing the solar panel:
• Seal the unused cable outlet on the junction box
(1) with the blind plug (2).
• Only use the outer terminals on the junction box.
• Only connect solar panels of the same type and
capacity.
• Connect two solar panels to the one junction
box closest to the roof duct.
Connect the solar panel as follows:
➤Connect the outdoor cable to the junction box
"
(A, fig. 9, page 5).
➤Connect several solar panels as follows in paral-
lel (B, fig. 0, page 6):
– Connect the positive poles with each other.
– Connect the negative poles with each other.
4445103707

Publicité

loading