Télécharger Imprimer la page

Harrie Leenders HL2 HANGHAARD Instructions D'installation page 18

Publicité

Les langues disponibles
  • FR

Les langues disponibles

General instructions and directions
• The installation of the HL2 Wall must be carried out by a skilled person employed by a dealer recognized by Harrie Leenders
Haardkachels.
• The casing parts are susceptible to scratching. Handle them gently.
• After the stove has been properly installed, burn some kindling wood to check the draught.
Safety recommendations
• Glass tends to break easily, and broken glass is quite sharp. Take therefore adequate safety precautions.
• For general safety, we refer to guidelines or regulations issued by a relevant official body.
Materials and tools required
• Handtruck
• Open-end wrench, jaw width 13
• Spirit level
• 4 xpansion-shell bolts, 4 stucco screws (included)
• Screwdriver
• Flat tape (included)
• Masonry bit 8 and 14 mm
• Flue pipe
• 5 mm socket-head wrench
• Clamping strip
1. Moving the stove
Place the stove with its back against the hand truck.
Move the stove on the hand truck to the place of installation
desired.
32
2. Wall bracket
• Determine the height desired of the bottom of the stove; recom-
mended height = 300 mm, the top hole of the wall bracket will
then be 780 mm above the floor.
• Mark off the holes to be drilled. Centre of wall bracket corres-
ponds to centre of stove pipe.
• First dril the holes using an 8 mm masonry bit, then re-dril the
holes using a 14 mm masonry bit.
self-adhesive
tape
3. Wall bracket
• Use the expansion shells with hexagon socket bolts supplied to
fix the wall bracket to the wall.
• Affix two strips of flat self-adhesive tape on the vertical strips of
the wall bracket.
5. Connecting the pipe
Make the pipe to size and connect it using the appropriate
fastening materials.
Top-connected stove pipe: Leavc a 50 mm gap between the
underside of the pipe and the upper side of the connection ring
of the stove.
The figure shows the top-connected stove pipe. This also
applies to the rear-connected stove pipe.
adjustment bolts
4. Hanging the stove
• Hang the stove with the slotted holes of the convection wall on the
hooks of the wall bracket.
• Level the stove using the adjustment bolts provided at the lower part
of the wall bracket.
clamping
strip
6. Clamping the pipe
Fix the clamping strip
33

Publicité

loading