Télécharger Imprimer la page

Rise SPARTACUS 275/600 Manuel D'installation page 14

Publicité

Les langues disponibles
  • FR

Les langues disponibles

GB
TECHNICAL DATA
Cylinder height
Cylinder diameter
Cylinder material
Ascent time
Descent speed
Supply
Power consumption
Hydraulics
Load class according to EN 124
Manual lowering in case of blackout
Automatic lowering in case of blackout
Obstacle detection in ascent
Capacitor
Daily cycles
Total cycles
Resistance to breakthrough
Impact resistance
Operating temperature
Degree of protection
Weight (without foundation box)
General information
Automatic hydraulic bollard.
Available with a painted steel tube or lined with an electropolished
AISI 316 stainless steel jacket.
The acoustic buzzer, the heater for particularly cold climates and
a pressure switch that prevents the tube exiting if there are people
or objects above it are available as optional accessories.
The MAX.CP control unit enables the management of two SPARTA-
CUS bollards for the protection of particularly large entrances.
Description
Figure 1 shows the main parts of the automation:
1 Head with flashing LED
2 275 mm diameter cylinder
3 Well lid
4 Adjustable magnetic limit switch sensor
5 Stop buffers
6 Electrical connection junction box
7 Hydraulic power unit
8 Hydraulic cylinder
14 SPARTACUS
Installation manual
275/600
275/800
275/600 - I 275/800 - I 275/600 - R 275/800 - R 275/600 - RI 275/800 - RI
600
800
AISI 316
S355JR
S355JR
Stainless
Steel
Steel
Steel
3 seconds
4 seconds
3 seconds
3 seconds
4 seconds
3 seconds
230V 50Hz (versions with special power supply on request)
40,000 J
250,000 J
for temperatures below -10°C (the optional heater accessory must be used)
94 kg
105 kg
99 kg
MODELS
600
800
600
275mm
AISI 316
S355JR
Stainless
Steel
Steel
4 seconds
3 seconds
4 seconds
3 seconds
550W
integrated
D400 (40 tonnellate)
Manual release
Optional
Optional
25 μF
3500
3000000
-40°C ÷ +60°C
IP67
112 kg
109 kg
Dimensions
Figure 2 shows the main overall dimensions, foundation box included.
The following openings in the foundation box must be broken
through:
1 Hole for 50 mm corrugated sheath for the passage of connection
cables (ref. C)
2 Holes for water drainage, if necessary use a PVC tube with a
90mm diameter (ref. S). The tube must be connected to a water
drainage system if the foundation drainage is insufficient (See
"Drainage test").
Preparation of the excavation
Referring to Figure 3, prepare an excavation of 1000x1000 mm with
a depth of 1300 mm(version 275/800) or 1100mm(version 275/600).
Prepare a gravel bed of 275 mm, we recommend gravel with a grain
size of 8/20 for good drainage.
Make sure that the gravel is well compacted.
Pay attention to the dimensions and levelling of the foundation.
800
600
AISI 316
AISI 316
S355JR
Stainless
Stainless
Steel
Steel
Steel
4 seconds
3 seconds
4 seconds
4 seconds
3 seconds
4 seconds
60,000 J
400,000 J
124 kg
114 kg
131 kg
800

Publicité

loading

Produits Connexes pour Rise SPARTACUS 275/600