Télécharger Imprimer la page

Zephyr Ombra ZOM-E30AS Guide D'utilisation, D'entretien Et D'installation page 16

Publicité

Les langues disponibles

Les langues disponibles

Airflow Control Technology (ACT)
Some local codes limit the maximum amount of CFM a range hood can move. ACT allows you to control the
maximum blower CFM of select Zephyr Ventilation range hoods without the need for expensive make up air kits.
ACT enables the installer to easily set the maximum blower speed to one of two most commonly specified CFM
levels; 390 or 290 CFM. The usage of ACT may not be necessary for your installation. Please check your local
codes for CFM restrictions.
By default the maximum blower CFM is set to 600.
!
CAUTION:
Hood must be disconnected from main power prior to performing the
conversion instructions listed below. Failure to do so could result in
personal injury or damage to the product.
To enable ACT
1. Before hood installation, gain access to PC board by following the steps shown in FIG. D.
2. Change plastic jumper positioning as shown in FIG. E to set the desired maximum blower CFM.
3. Re-install PC board & continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the hood body below
the wiring diagram or in another clearly visible location.
Models: ZAZ, ZLU, ZRM, ZRO, ZRV
- Locate PC board box on top of blower housing.
NOTE: After re-positioning the jumper and powering on the hood, the CFM cannot be changed again.
- Remove 2 to 4 screws attaching PC board cover.
To verify if your installer enabled ACT
With hood off, press and hold the power button for five seconds. If speed 4 indicator illuminates = default max.
CFM, if speed 3 indicator illuminates = max. 390 CFM, and if speed 2 indicator illuminates = max. 290 CFM.
When ACT is enabled, the number of blower speeds will be reduced. 390 CFM = max. 3 speeds and 290 CFM =
max. 2 speeds.
There should also be a foil label located inside the hood body near the wiring diagram that indicates the blower
CFM.
Models: ZOM
- Remove aluminum mesh filters.
- Remove 4 to 6 screws attaching PC board cover.
FIG. D
Models: AK70, AK75
- PC board located behind the light panel.
- Remove baffle filters.
- Remove both side spacer panels (if applicable) by 2 screws for each spacer panel.
- Remove 4 screws attaching light panel.
D I S C A R D T H I S P A G E A F T E R C F M C O N V E R S I O N
Accessing PC Board Instructions
Model: ZSI
- PC board located behind the light panel.
- Remove aluminum mesh filters.
- Remove 2 screws attaching light panel.
Model: AK92
- PC board located behind the light panel.
- Remove baffle filters and residue tray.
- (AK9228AS only) Remove both spacer panels by 2
screws for each spacer panel.
- Remove 5 screws attaching light panel.
7
8
5
6
3
4
1
2
14
2
www.zephyronline.com
Default Max. Blower CFM
7
5
3
1
J u m p e r
Max. Blower CFM
390
PC Board
FIG. E
Jumper Pins
Plastic
7
8
Jumper
5
6
3
4
1
2
J u m p e r
5 - 6 or 7-8
DEFAULT POSITION
8
7
8
6
5
6
4
3
4
2
1
2
3 - 4
J u m p e r
1 - 2
Max. Blower CFM
290

Publicité

loading

Ce manuel est également adapté pour:

Ombra zom-e30absOmbra zom-e36asOmbra zom-e36abs