KOBE CHX8130SQB-1 30 Manuel D'installation Et Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT DEBRIS FROM ENTERING
THE VENT OPENING.
- Decide the location of venting pipe from the hood
to the outside. Refer to Figure 1.
- A straight, short venting run will allow the hood
to perform more efficiently.
- Try to avoid as many transitions, elbows, and
long run as possible.
performance of the hood.
- Use duct tape to seal the joints between pipe
sections.
- Temporarily wire the hood to test for proper
operation before installing.
- If necessary, prepare back wall frame with cross
framing lumber for secure installation.
references on Table 1 and the measurements on
pages 13, decide the level of the lumber. Refer
to Figure 2.
- Peel protective film off the duct cover and the
hood (if any).
Hood Installation
CAUTION: If required to move the cooking
range to install the hood, turn off the power on
an electric range at the main electrical box.
SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.
1.
Using
references
measurements on pages 13, mark the
leveling point for hood-mounting bracket on
the wall.
2.
Secure 3 mounting screws (provided) on the
wall leaving 1/8" away from the wall. Refer to
Figure 3.
3.
Align hood-mounting bracket to the mounting
screws on the wall and hook hood into place.
4.
Secure and tighten the mounting screws.
CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
This may reduce the
Using
on
Table
1
and
Figure 1
Figure 2
Figure 3
7

Publicité

Table des Matières
loading

Table des Matières