Télécharger Imprimer la page

2- Or 4-Post Mounting (Lcr2400 Model Only); Quick Installation - Tripp-Lite LC1200 Manuel Du Propriétaire

Masquer les pouces Voir aussi pour LC1200:

Publicité

Les langues disponibles

Les langues disponibles

2- or 4-Post Mounting
When mounting the LCR2400 line conditioner in a 2-post or 4-post rack, the user must
determine the fitness of hardware and procedures prior to installation. The procedures
described in this section are for common rack and rack enclosure types and may not be
appropriate for all applications.
1
To install the line conditioner to a rack, insert
the included or user-supplied screws and
washers through the LCR2400's mounting
ears and into the rack rails. Secure the unit
to the rack by tightening the screws with the
included or user-supplied nuts.

Quick Installation

1
Connect your line conditioner to an electrical
outlet.
2
Plug your computer and electronics into your
line conditioner's outlets.
3
Turn your line conditioner's power switch on.
15-12-402-933510.indb 3
(LCR2400 Model Only)
1
1
2
3
3
1/18/2016 12:45:54 PM

Publicité

loading

Ce manuel est également adapté pour:

Lc1800Lc2400Lcr2400