KOBE Premium Série Manuel D'installation Et Mode D'emploi page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation Before Installation
NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS
FROM ENTERING THE VENT OPENING.
Decide the location of the venting pipe from the hood to the
outside. Refer to Figure 1.
A straight, short vent run will allow the hood to perform more
efficiently.
Try to avoid as many transitions, elbows, and long run as
possible. This may reduce the performance of the hood.
Temporarily wire the hood to test for proper operation before
installing.
Important: Peel protective film off the hood, if any.
Use duct tape to seal joints between pipe sections.
CAUTION
: If moving the cooking range is necessary to
install the hood, turn off the power in an electric range at
the main electrical box. SHUT OFF THE GAS BEFORE
MOVING A GAS RANGE. And use a protective covering to
protect cooktop and/or countertop from damage.
Custom Hood Preparation
1. The custom hood frame must be designed based on the shape
and the weight of the hood. Refer to Measurements and
Diagrams of hood on Page 15-17.
2. A sturdy base (3/4 inch thick plywood recommended) is needed
to sustain the weight of hood.
3. It is recommended to install front & rear stud support (not
included).
Refer to Figure 2.
installation holes on the side of the hood are provided. Prepare
the side stud support if needed.
4. Determine and mark the centerlines on the base of the wood
frame where the hood will be installed.
5. Determine the proper location for the Power Supply Cable.
Make a wiring access hole using a drill bit.
cable and seal the gap around hole.
6. Cut out the opening where the hood will be installed. (Refer to
Figure 3 for appropriate dimensions based on width of hood.)
Wiring to Power Supply
CAUTION
: If moving the cooking range is necessary to
install the hood, turn off the power in an electric range at
the main electrical box. SHUT OFF THE GAS BEFORE
MOVING A GAS RANGE. RISK OF ELECTRICAL SHOCK.
THIS RANGE HOOD MUST BE PROPERLY GROUNDED.
MAKE SURE THIS IS DONE BY QUALIFIED ELECTRICIAN
IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND
LOCAL ELECTRICAL CODES.
WIRES, SWITCH POWER OFF AT SERVICE PANEL AND
LOCK SERVICE PANEL TO PREVENT POWER FROM
BEING SWITCHED ON ACCIDENTALLY.
7. Temporarily wire the hood to test for proper operation before
installing. If the hood does not operate, check the circuit breaker
or house fuse. If the hood is still not working, disconnect power
supply and check the continuity of all wire connections.
8. If hood is operating normally, connect three wires (black, white
and green) to house wires and cap with wire connectors.
9. Store wires in the wiring box.
For safety purposes, extra
Install the wire
BEFORE CONNECTING
7
Figure 1
Figure 2
Figure 3
IN2636SQB-1200 (36")
IN2642SQB-1200 (42")
IN2648SQB-1200 (48")

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Premium in2636sqb-1200Premium in2642sqb-1200Premium in2648sqb-1200In2636sqb-1200In2642sqb-1200In2648sqb-1200

Table des Matières