KOBE Premium Série Manuel D'installation Et Mode D'emploi page 10

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Ductwork Installtion
10.
11.
steel 8" round pipe to connect the ductwork above to the
exhaust of the hood. The hood is preinstalled with a rectangular
to 8" round transition (Refer to Figure 4). Use duct tape to make
all joints secure and air tight.
12.
Hood Installation
NOTE: USE HAND TOOLS ONLY.
SCREWS. IT MAY CAUSE DAMAGE TO THE HOOD.
13. Remove the light panel by removing screws located at the bottom
of the hood (8 screws for 36" & 42" and 11 screws for 48") Refer
to Figure 5 as reference. Carefully remove the light support
panel.
14. Position the hood inside the custom wood frame, and secure the
hood to the front and rear stud support ( Refer to Figure 2) by
using the front and rear mounting holes (Screws included).
15. For a more secure installation, use the mounting holes located
on the side of the hood
16. Make sure hood is secure before releasing.
17. Re-install the light support panel. (Do not over tighten screws.)
CAUTION
: MAKE SURE HOOD IS SECURE BEFORE
RELEASING
Final Assembly
18. Install the oil tunnel into recess support near rear of hood.
Refer to Figure 6.
19. Install baffle filters. Angle baffle filter toward back of hood ①
. Push baffle filter up until almost level ②. Slide forward into
recess behind the front of hood ③. Lower baffle filter ④. Slide
back until it fits into resting position ⑤. Refer to Figure 7.
DO NOT OVER TIGHTEN
8
Figure 4
Figure 5
Figure 6
Figure 7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Premium in2636sqb-1200Premium in2642sqb-1200Premium in2648sqb-1200In2636sqb-1200In2642sqb-1200In2648sqb-1200

Table des Matières