Télécharger Imprimer la page

Aquaglide RECOIL TRAMP 14.0 Manuel Du Propriétaire page 7

Publicité

Les langues disponibles

Les langues disponibles

4. Repeat step 3 instructions to inflate C-Deck boarding platform to proper Working Pressure shown in
Chart 1.
5. Assemble steel frame sections and attach loosely with frame straps. Thread frame sleeve onto frame
near each joint. Sleeves cover frame bolts once installed. With frame assembled, lock each joint using
frame through-bolts. Secure each frame bolt using 5mm Allen tools (included),
then cover each bolt with a sleeve. Tighten frame straps securely. See D.
6. Attach jump mat & springs. Begin with 2 opposite corners (2 springs each).
See E-1. Work evenly until all 8 corners are attached. Always attach spring
hooks facing downward to prevent injury. Spring hook tools are included for
this task, best done with 2 people. See E-2.
7. Attach remaining springs. Always install springs evenly on opposite sides
of trampoline and with spring hooks facing
downward.
8. Attach anchor bridle to steel frame in every
other corner. Bridle uses 2 ropes: one long
(BLACK ends), and one short (WHITE ends).
Black ends must be attached in opposite corners
and white ends must be attached in opposite
corners. See F-1. To make bridle connection,
remove webbing strap from bridle end and slide
under frame at corner. See F-2. Lead lower
end of webbing through loop in upper end. See
F-3. Pull to tighten (See F-4), then reconnect
webbing strap to bridle at lower loop using
locking stainless quick link. See F-5. Tighten link
securely to ensure it cannot loosen or become
disconnected in rough weather.
9. Attach outer perimeter of spring pad cover
to frame at each corner by pushing webbing
strap between frame and tube. After connecting
loosely, lead webbing tail back under frame and
pull from beneath to tighten full. See G-1.
10. Attach inner perimeter of spring pad cover
through jump mesh rings at each corner. After
connecting loosely, lead webbing tail back through ring and pull from beneath
to tighten fully. See G-2.
11. Confirm that suitable anchor(s) and mooring lines are in place before
launching this item (see Anchoring).
12. To launch product, lift completely and place in water. Large items may
require many extra people to accomplish this. Never drag product as damage
may occur.
13. When connecting multiple items
together at the waterline, always follow
manufacturer's recommendations.
Waterline connections use only
Aquaglide Two-Step Vario-lock cinch
straps and connecting rings. Make
sure connection is tight and there is
NO GAP between items. Failure to
connect items properly may result in injury or death.
a. Attach straps to C-Deck boarding platform, included, or other 'Connector.' C-Deck uses 3
ring/ straps to connect to Recoil 14.0.
b. Use all available rings to make connection. Standard connections use 5 rings. Some items
use 3 or occasionally 7 rings/ straps. Recoil 14.0 has 5-ring sets on 2 sides at the waterline.
7
E-1
2
1
F-1
Black
White
White
Black
F-3
G-1
D
E-2
2
5
3
7
8
4
6
1
F-2
F-4
F-5
G-2
www.aquaglide.com

Publicité

loading