Télécharger Imprimer la page

Installation Instructions - Dion-Ag F6113T940 Instructions D'assemblage

Publicité

Les langues disponibles

Les langues disponibles

Instructions d'installation/ Installation instructions : F6113T940
Ensemble Adaptateur F61 / Adapter kit F61 : GEHL K26190
Step 1: Reception
See operator's manual for the reception and removal of transport skid. Important :
Remove the temporary lifting arm before operating the header.
Step 2: Preparation
Open the left side guards as shown.
Remove the tightener bracket (1) and disassemble the spring (2) from the tightener rod
by removing the two locking nuts.
Step 3: Installation of the left module
Install the support (3) with provided flange bolts 1/2'' x 1-1/4'' (4) and ½" x 1" (5).
22 janvier 2013

Installation instructions

Publicité

loading