Haverland GP6 CPL Guide D'utilisation Et D'installation page 22

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.2 Configuring the load shedding
The load shedding is configured using switches located on the upper connection terminal of
the GP6 CPL.
Three -
Single -
1 2 3 4
Delayed -
Immediate -
1 2 3 4
Cascade -
Cascadocyclique -
1 2 3 4
Test -
Normal -
1 2 3 4
4.3 Switching on the unit for the first time
When the installation is switched on for the first time, the three
flash, informing you that the product has not yet been configured.
4.4 Configuring the receivers
When starting up the unit for the first time, you must determine how the installation will be
organized.
From the GP6CPL, the starting up involves assigning different receivers to a control
function for the heating, domestic hot water, household appliances, etc.
Switch 1: Single-phase or three-phase
For a three-phase installation with electromechanical meter, you
must have 3 CTs (current transformers):
1 per phase
Switch 2: Load shedding delay
The load shedding delay (about 3 seconds) is used for
applications featuring a heat pump.
Switch 3: Cascade or cascadocyclique load-shedding
See section 5.2 (Load shedding).
Switch 4: Load shedding test
Enables a rapid test of the load shedding when the system is
installed.
It must be reset to NORMAL after the Test.
- 22 -
,
and
LEDs
OK
OK
OK O K

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rpgp6

Table des Matières