Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Bag wicket
Note: Bags must be placed behind rear stainless chute.
1.
Move chute lever to down position (Fig. 13.1).
2. Transfer bags from wicket to bag pins by removing
cardboard backing and sliding 15 to 20 bags onto pins at a
time until posts are full (Fig. 13.2).
3. Return chute lever to up position (Fig. 14).
Sanitize
Follow cleaning and sanitizing instructions in manual 00127886.
Icemaker
Follow icemaker manufacturer's recommendations for installation.
Note: Icemaker(s) mounted on thin top may not exceed 272kg
(600 lbs). Icemaker(s) mounted on thick top may not
exceed 590kg (1300 lbs).
Adjustments
The installer should make the following initial adjustments to ensure
proper operation of the dispenser.
1.
Tie-down adjustment
a) Release latch on side of dispenser.
b) Rotate bolt clockwise to increase tension.
c) Engage latch and verify tension has been increased.
2. Bag stand
The bag stand platform may be raised or lowered to
accommodate multiple bag sizes (Fig. 15). The bottom of bags
should touch platform when adjustment is complete.
a) Lift bag stand platform up and out of receiving slot on bag
stand base.
b) Insert bag stand platform in and down into next receiving
slot above bottom of bag.
3. Dispense duration
In timed mode, the dispense duration dial of the control panel
adjusts the length of time the unit dispenses ice.
a) Rotate dial clockwise to lengthen dispense duration. Rotate
counterclockwise to shorten dispense duration.
b) Verify timed mode is selected.
c) Press start button to test length of duration. Adjust as
necessary.
Fig. 13
1
Fig. 14
Fig. 15
12
2

Publicité

Table des Matières

Dépannage

loading

Table des Matières