Hood Preparation - NuTone NTM Serie Instructions D'installation

Masquer les pouces Voir aussi pour NTM Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

HOOD PREPARATION

1. Remove the bottom panel of the hood by removing its (5) mounting screws and set
aside.
2. Unplug the small white connector inside the hood.
3. Remove the (2) screws retaining the electrical box cover and set aside. Punch out the
wiring knock-out located on the TOP of the unit and install an approved wire clamp (not
included).
HOOD PREPARATION - VERTICAL DISCHARGE INSTALLATION
1. Install the small shutoff plate (with its gasket) INSIDE the back of the hood, using
10 screws (included).
2. Install the large shutoff plate on the BACK of the hood, using 5 screws (included).
3. Install the rubber gasket (included) on the top of the hood, as shown beside.
HO0046
HE0054
HO0047
HO0048
HO0049
HO0050
-3-
MOUNTING SCREW LOCATIONS
SCREW LOCATIONS

Publicité

Table des Matières
loading

Table des Matières