FAIE AQUALINE 3kW Mode D'emploi page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Length in
meters
6.
It is not recommended to install T-connections on the circuit. Per T-connection or elbow withdraw 1m of tubing length.
7.
It is very much recommended to install a filter in order to protect the pump and the heating coil from dirt (especially if the water comes from a well).
8.
The maximum advised water pressure is 6 bars. A safety overpressure valve of 6 bars is delivered with the heater. Using an expansion tank is also
highly recommended so as to balance the pressure inside the tubes
Purging the water circuit for the first start:
For purging the circuit before the first start, check that all the air-bleed valves (placed at each highest point of the circuit) are well opened. To open the
bleeders, unscrew the cap 2 rotations.
Use a screwdriver to open the air bleed valve installed on the Aqualine. You can close it as soon as water is dripping out of the valve. It is
recommended to restart this procedure once in a while to make sure that no air is trapped into the Aqualine.
Last update 10 12 2018
Diagram 2: Maximum length for 1/2" tubing or 15 mm inside diameter
Number of drinking bowls
USER GUIDE
AQUALINE
3kW
Valid for an outside temperature of -20°c
and a water temperature of 10°c.
Length for insulated polyethylene tubing
Length for insulated steel tubing
Length for non insulated polyethylene tubing
Length for non insulated steel tubing
6

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Asw 5023013000mAsw 5023013000m +cbAsw 5023013000m +cbd43533

Table des Matières