oventrop Regucor WHS Mode D'emploi page 27

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

L = 230 mm
Steel nut
L = 185 mm
Illustr. 8 Installation of bracket assembly
– The ball valves G1 with seals must be connected
at the right hand side with the storage cylinder (il-
lustr. 9 point 1).
– Fit caps G1 with seals at the left hand side with the
storage cylinder (point 2).
– Remove locking plate from the bracket.
– Push rear insulation shell of the heating circuit
group over the bracket and fix it with the help of
the clamping plate, washers and nuts (point 3).
Illustr. 9 Installation of ball valves and insulation hea-
ting circuits
Brass nut L=22 mm
– The corrugated metal pipes with seals and a length
of L = 45 mm must be connected with the heating
circuit group (illustr. 10 point 1). Suspend group
into the bracket (point 2), mount locking plate and
fix it to the bracket (point 3).
– Connect the corrugated metal pipes to the ball val-
ves.
– Close the ball valves.
Illustr. 10 Installation of heating circuit group
NOTICE
The heating circuit connections of the storage cy-
linder must only be used for the connection of
the heating circuit groups
27

Publicité

Table des Matières
loading

Table des Matières