Installation Preparation; Plumbing Installation / Water Connections - ShowerLux Prime Line Free Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PluMbInG InStallatIon
Equipment:
The Prime Line Sparkling + Music is prepared to be ready for connection
All models are fitted with a frame including bathtub feet, as well as a drain and an overflow.
All bathtubs have a functional and leak test completed at the factory before they are delivered.

Installation preparation:

Clean the area below the bathtub thoroughly in order to prevent any debris being drawn into the an.
Only install the bathtub on a surface which is suitable for use in a wet room (tiled or sealed floor)
Soundproofing: When installing, pay attention to DIN 4109 or SIA 181 (soundproofing in building
construction)
Installation:
The height of the Prime Line Sparkling + Music can be adjusted to level it
Seal all open joints with plumber's silicone after completing work
Water connection:
If the drain and overflow fittings are installed with an integrated bathtub water inlet, the
manufacturer's specifications must be observed.
The connection to the water supply must be carried out by a licensed plumber. The installation
must be done in accordance with DIN EN 1717 (pipe interrupter).
All other country-specific regulations must be observed.
12

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Prime line sparkling + music

Table des Matières