Casselin C1 BLANC Mode D'emploi page 20

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3/A Fixing holes B Wall plug C Fixing screws D Back plate E Cable entry hole F Cable clamp G Grommet H
Fixing screws
4/ A. Live B. Neutral C. Earth D. Cable clamp E. Grommet F. Main supply.
5°)
6°)
Template
Installation instructions and use :
- Position the hand dryer as shown in the picture 1. Release the casing from the back plate by
removing the screws with Allen key.
- Fix the hand dryer approximately 1.3m from floor, picture 2.
- Using the template provided with the appliance, mark the positions for the fixing holes. To conceal
the mains power supply drill out the cable entry hole.
- Using a drilling machine with a bit of 8mm, drill the fixing holes in order to place the wall plugs and
fixing screws.
- Insert the wall plugs so they are flush with the mounting surface. Then fix the back plate with the
fixing screws.
- Release the cable clamp, pierce the grommet cap and slide it over the cable end. Bring the cable
through the eyelet and connect the mains supply cable to the terminal block.
Pictures 3 and 4:
The wire coloured Brown or Red must be connected to the terminal block marked A (Live) or the
Red wire on the terminal block.
- The wire coloured Blue or Black must be connected to the terminal block marked B (Neutral) or
the Blue wire on the terminal block.
20

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

C1 inoxCb2 blancCb2 inox

Table des Matières