Télécharger Imprimer la page

SUNTEC Heat Patio Mode D'emploi page 13

Publicité

 The surface of the unit remains during operation and for
some time after switching off hot. Please take care to avoid
burns.
 The product must not be exposed to vibration or shock.
Please use the device with caution.
 The device may only be operated connected to ground.
 Please keep the device away from flammable materials.
 Please allow the unit to cool completely before you clean or
move it.
Important: This heater is equipped with a temperature
control unit. Please do not operate the unit near people who
cannot move independently be, unless they are supervised
throughout.
Components / Scope of supply
Screw M6 * 50 (2 pieces)
Equipment base
Base cover
Equipment housing
Installation
 Please place the device on the head (Figure A). Connect the plug (8) and the power cord
through the holes in the center of the base cover (3) and the base (2). Mount the base cover (3),
the base (2) and the screw nuts (6) on the main body.
 Fasten the two screw nuts (6), the base (2) and the base cover (3) using the screws M6 * 20 (1).
 Secure the power cable with the clip (5) at the base and screw the cable clip with the screws
M4 * 35 (7) fixed, as shown in the picture B.
Cable clip
Screws Nuts (2 pieces)
Screw M4 * 28 (2 pieces)
Allen key
13

Publicité

loading