EGO Power+ ZT4200L Mode D'emploi page 29

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TO ATTACH THE MULCHING PLUG (Sold separately)
1. To set up the mower for mulching, lift the side-discharge chute
first, then hook the mulching plug onto the deck opening at the
spots 2, 3, and 4 as shown in Fig. 13. Make sure that all the
hooks are securely fastened in their places and prevent the
mulching plug from moving. Leave the side-discharge chute in
the open position.
2. To remove the mulching plug, separate the movable spring of
the mulching plug from the hook on the deck first and then
remove it from the deck opening. Lower the side-discharge
chute slowly until it rests firmly against the deck.
13
56-VOLT LITHIUM-ION ELECTRIC ZERO TURN MOWER — ZT4200L/ZT4200L-FC
1
4
Movable Spring
Side Discharge Chute
3
2
Mulching Plug
29

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Power+ zt4200l-fc

Table des Matières