Hansgrohe AXOR Starck 10407 1 Série Instructions De Montage / Mode D'emploi / Garantie page 6

Masquer les pouces Voir aussi pour AXOR Starck 10407 1 Série:
Table des Matières

Publicité

3.

2.
4.
4 mm
1.
3.
1.
English
Flush the hot and cold supplies
(1) Remove the cover.
(2) Open the cold stop using a 4 mm Allen
wrench.
(3) Allow the cold supply to flush for at least five
minutes.
(4) Close the cold stop.
2.
(1) Remove the flushing block using a 5 mm Allen
wrench. Turn it 90° and reinstall.
(2) Open the hot stop.
(3) Allow the hot supply to flush for at least 5
minutes.
(4) Close the hot stop.
2.
4.
4.

Publicité

Table des Matières
loading

Table des Matières