Installation Position; Hydraulic Connection - Stiebel Eltron HUV 1 Utilisation Et Installation

Masquer les pouces Voir aussi pour HUV 1:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

operAtion
instAllAtion
3.4.2 Servo drives
Dimensions HUV 1 | 2
HUV 1 | HUV 2
25
(33)*
R65
HUV 65 | HUV 80
Dimensions HUV 65 | 80
179
193
45
* Values in brackets are for HUV 1.
12 |
103
(117)*
(177)*
134
55
110
98
72
4.
Installation
4.1

Installation position

The 3-way switching valves can be installed either vertically or
horizontally.
Beware of damage
!
The 3-way switching valves may not be installed sus-
pended, i.e. with the tappet facing down.
Permissible installation positions
90°
4.2

Hydraulic connection

Beware of damage
!
The conditions in VDI 2035 regarding water quality must
be complied with. So that the 3-way switching valve con-
trols the flow for a long time, we recommend the use of
contamination filters.
Beware of damage
!
Make sure the ball is correctly positioned in
the 3-way switching valve (note the mark on
the spindle).
Note
As well as the flow direction A – AB and B – AB which
is marked with an arrow on the housing, the opposite
direction AB – A and AB – B is also permitted in STIEBEL
ELTRON or Tecalor heat pump systems.
A
AB
B
A
AB
B
90°
A
AB
B
A
AB
B
HUV 1/2/65/80

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Huv 2Huv 65Huv 80

Table des Matières