Empire Comfort Systems Gateway 1700 Mode D'emploi page 166

Masquer les pouces Voir aussi pour Gateway 1700:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Report prepared for: Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on 4/30/2018 7:18:14 AM
Test report 103328128MTL-001 (3 of 18)
Stove Builder International Inc.
Project No. G103328128
IV. SAMPLING SYSTEMS ......................................................................................................12
IV.A. SAMPLING LOCATIONS ................................................................................................................... 12
IV.A.(1) DILUTION TUNNEL .................................................................................................................... 13
IV.B. OPERATIONAL DRAWINGS ............................................................................................................. 14
V.A. PARTICULATE SAMPLING ............................................................................................................... 15
VI. QUALITY ASSURANCE ......................................................................................................15
VI.A. INSTRUMENT CALIBRATION ........................................................................................................... 15
VI.B. TEST METHOD PROCEDURES .......................................................................................................... 16
VI.B.(3).
VII. CONCLUSION ..................................................................................................................17
REVISION SUMMARY ..............................................................................................................18
Note: See electronic version for Appendices content.
Appendix A:
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Appendix F:
Appendix G:
Appendix H:
Appendix I:
Stove Builder International Inc. | 43615 | Rev: Apr 27 2018 2:35PM | Uncontrolled Copy
DILUTION TUNNEL SAMPLE SYSTEMS ............................................................................... 14
DRY GAS METERS ............................................................................................................ 15
STACK SAMPLE ROTAMETER ........................................................................................... 16
GAS ANALYZERS .............................................................................................................. 16
LEAK CHECK PROCEDURES .............................................................................................. 16
TUNNEL VELOCITY/FLOW MEASUREMENT ..................................................................... 17
PM SAMPLING PROPORTIONALITY ................................................................................. 17
Laboratory Operating Procedure
Data and Calculation forms
Calibration Documents
Unit Drawings and installation Manual
Dry Gas Meter Calibration Data
Unit Pre-Burn Documentation
Stack Loss Efficiency and Data Results
Tunnel Cleaning and test load photographs
EPA Correspondance
Date: December 27, 2017
Page 3 of 18
Page 156 of 195

Publicité

Chapitres

Table des Matières
loading

Table des Matières